RUS  ENG
Полная версия
ЖУРНАЛЫ // Journal of Computational and Engineering Mathematics // Архив

J. Comp. Eng. Math., 2015, том 2, выпуск 1, страницы 57–64 (Mi jcem15)

Эта публикация цитируется в 3 статьях

Computational Mathematics

Forming of discrete mechanical assembly production program

A. V. Panyukova, V. A. Teleghinb

a South Ural State University, Chelyabinsk, Russian Federation
b South Ural State University, Miass Branch

Аннотация: Searching of the optimal production program methods are observed. The aggregated mathematical model and the model with the alternative technological rotes and the bottleneck problem are proposed. In addition, the procedure of deriving of new production established standards based on accumulation statistics is proposed. Ways of flexible automation of production problem search processes for enterprises are denoted.

Ключевые слова: production program, transportation problem, factory-assembled problem, working center, pattern of production, established standards, guidelines.

MSC: 90B30

Поступила в редакцию: 08.10.2014

Язык публикации: английский

DOI: 10.14529/jcem150107



Реферативные базы данных:


© МИАН, 2024