RUS  ENG
Full version
JOURNALS // Avtomatika i Telemekhanika // Archive

Avtomat. i Telemekh., 2021 Issue 1, Pages 131–146 (Mi at15655)

This article is cited in 6 papers

Control in Technical Systems

On the problem of increasing the railway station capacity

A. N. Ignatov, A. V. Naumov

Moscow Aviation Institute, Moscow, 125993 Russia

Abstract: We consider the problem of increasing the capacity of a railway station taking into account some basic timetable for the station. To this end, the time and route for each additional train are determined by solving a set of mixed integer linear programming problems. A scheme is proposed to take into account the influence of random delays in the movement of trains on the possibility of their passage through the railway station. The results of a numerical experiment are presented.

Keywords: railway station, capacity, graph, mixed integer linear programming.

Presented by the member of Editorial Board: A. I. Kibzun

Received: 23.02.2020
Revised: 10.06.2020
Accepted: 09.07.2020

DOI: 10.31857/S0005231021010074


 English version:
Automation and Remote Control, 2021, 82:1, 102–114

Bibliographic databases:


© Steklov Math. Inst. of RAS, 2024