RUS  ENG
Full version
JOURNALS // Avtomatika i Telemekhanika // Archive

Avtomat. i Telemekh., 1982 Issue 6, Pages 161–170 (Mi at5555)

Technical Diagnostics

Planning a test control of systems with constraints on check timetable

G. E. Engibaryan

Erevan

Abstract: Units are tested of a system which operates in a cyclic mode where the time interval scheduled for control in each cycle is strictly fived. Test sets have to he distributed among control intervals so as to the system credibility.

UDC: 681.326.7


Received: 03.02.1981


 English version:
Automation and Remote Control, 1982, 43:6, 834–841

Bibliographic databases:


© Steklov Math. Inst. of RAS, 2024