Abstract:
The procedure of determining the forerunner of a fuzzy set is embodied in an algorithm of multi-staged optimization of serially structured systems. For illustration the choice of a reliability level of integrated systems is taken which would meed fuzzy requirements to the cost of a complete life cycle of an electronic product.