RUS
ENG
Full version
JOURNALS
// Avtomatika i Telemekhanika
// Archive
Avtomat. i Telemekh.,
1976
Issue 7,
Pages
154–158
(Mi at7958)
Automated control systems
The scheduling a three-machine job shop problem
A. I. Babushkin
,
A. L. Bashta
,
I. S. Belov
Kharkiv
Abstract:
As an extension of [1] a schedule is developed for 3-machine job shop problem for which the difference between total elapsed time and minimal time does not exceed
$3(3\sqrt{2}+5)\max t_{ij}$
. A scheduling algorithm is given.
UDC:
621.9.06:658.5
Received:
22.04.1975
Fulltext:
PDF file (751 kB)
English version:
Automation and Remote Control, 1976,
37
:7,
1109–1113
Bibliographic databases:
©
Steklov Math. Inst. of RAS
, 2024