Abstract:
Solutions of certain schedule choice problems are described where the schedule should be optimal as far as the maximal probability that the planned targets will be over the entire period covered by the schedules. Problems are also formulated on the choice of a target so as to maximize the cost effectiveness with optimal schedules met within the period.