RUS  ENG
Full version
JOURNALS // Modelirovanie i Analiz Informatsionnykh Sistem // Archive

Model. Anal. Inform. Sist., 2014 Volume 21, Number 2, Pages 26–38 (Mi mais368)

This article is cited in 4 papers

Construction of PLC IL-Programs by LTL-Specification

D. A. Ryabukhin, E. V. Kuzmin, V. A. Sokolov

P. G. Demidov Yaroslavl State University, Sovetskaya str., 14, Yaroslavl, 150000, Russia

Abstract: An approach to the construction and verification of PLC IL-programs for discrete problems is proposed. For the specification of the program behavior, we use the linear-time temporal logic LTL. Programming is carried out in the IL-language (Instruction List) according to an LTL-specification. The correctness analysis of an LTL-specification is carried out by the symbolic model checking tool Cadence SMV. A new approach to programming and verification of PLC IL-programs is shown by an example. For a discrete problem, we give an IL-program and its LTL-specification.
The purpose of the article is to describe an approach to programming PLC, which would provide a possibility of IL-program correctness analysis by the model checking method.
Under the proposed approach, the change of the value of each program variable is described by a pair of LTL-formulas. The first LTL-formula describes situations which increase the value of the corresponding variable, the second LTL-formula specifies conditions leading to a decrease of the variable value. The LTL-formulas (used for specification of the corresponding variable behavior) are constructive in the sense that they construct the PLC-program (IL-program), which satisfies temporal properties expressed by these formulas. Thus, the programming of PLC is reduced to the construction of LTL-specification of the behavior of each program variable. In addition, an SMV-model of a PLC IL-program is constructed according to LTL-specification. Then, the SMV-model is analysed by the symbolic model checking tool Cadence SMV.

Keywords: programmable logic controllers, software engineering, specification and verification of PLC-programs, Instruction List.

UDC: 517.9

Received: 03.02.2014



© Steklov Math. Inst. of RAS, 2025