Abstract:
The process of restructuring of simulation models of probabilistic technological processes with a control system for solving multi-criteria optimization problems in the management structure of the automation of project modeling of new technological facilities is offered. The theoretical substantiation of a way of restructuring and technology of its application on the basis of the adaptation of the structure of the control system of a simulation model to the conditions of functioning of the technological cycle are shown. The ability to use the proposed approach for assessing the quality of project simulation in constructing optimal structure of the control system of the technological cycle of production is justified.