RUS  ENG
Full version
JOURNALS // Problemy Upravleniya // Archive

Probl. Upr., 2010 Issue 1, Pages 47–52 (Mi pu8)

This article is cited in 6 papers

Administration of engineering systems and technological processes

The calculation of some properties for enterprise network used in plants with high exploitation risk

S. I. Masolkin, V. G. Promyslov

Institute of Control Sciences, Russian Academy of Sciences

Abstract: The modern APCS of big industrial plants including the nuclear power plants is constructed as distributed in function and facilities system. The system components are interacted between each other by means of the industrial network. The model of the APCS division and the method for calculation of worse network parameters have been developed on the base of the network calculus theory. Using this theory the maximum delay for signal propagation within a branch of APCS is computed for a given input parameters.

Keywords: modeling, network calculus, networks, nuclear power plants.

UDC: 621.039:681.5



© Steklov Math. Inst. of RAS, 2025