RUS  ENG
Full version
JOURNALS // Problemy Upravleniya // Archive

Probl. Upr., 2009 Issue 5, Pages 36–43 (Mi pu97)

This article is cited in 3 papers

Control in the socio-economic systems

Production management on the tactical level of planning under the fuzzy initial information

S. A. Fedoseev, A. V. Vozhakov, M. B. Gitman

Perm State Technical University

Abstract: The paper considers a production scheduling model with fuzzy measures and constraints. The model is based on the fuzzy sets theory. As an example the actual production schedule of Zavod SDM, Ltd. (Perm city) is considered.

Keywords: production management, software, material requirements planning, fuzzy information.

UDC: 519.711.3:371.214.27



© Steklov Math. Inst. of RAS, 2024