RUS  ENG
Full version
JOURNALS // Vestnik Udmurtskogo Universiteta. Matematika. Mekhanika. Komp'yuternye Nauki // Archive

Vestn. Udmurtsk. Univ. Mat. Mekh. Komp. Nauki, 2014 Issue 4, Pages 122–141 (Mi vuu456)

This article is cited in 5 papers

MATHEMATICS

The Bellmann insertions in the route problem with constraints and complicated cost functions

A. G. Chentsovab

a N. N. Krasovskii Institute of Mathematics and Mechanics, Ural Branch of the Russian Academy of Sciences, ul. S. Kovalevskoi, 16, Yekaterinburg, 620990, Russia
b Ural Federal University, ul. Mira, 19, Yekaterinburg, 620002, Russia

Abstract: The problem of sequential circuit of megalopolises with precedence conditions and cost functions that permit a dependence on tasks list is considered. Such problems can arise, in particular, in atomic energetic while investigating the questions connected with lowering of workers irradiation under permutations in radiative fields for realization of services connected with division of radiating elements. Another application of the developed methods is connected with important engineering problem of routing the instrument movements under the leaf cutting on numerically controlled machines. This problem has sufficiently large dimensionality and many precedence conditions: if a detail has not only exterior but at least one interior contours (the simplest example is a washer) then the interior contours must be cut before the cutting of exterior contour (finite sets located near corresponding contours are used as megalopolises). In this case the possible dependence of cost functions on tasks list can reflect various technological conditions. We note that perceptible dimensionality characterized by all contours in total leads to necessity of heuristics employment. Therefore, questions concerning at least local improvement of solutions appear sufficiently important for the investigation.
The basic attention in the article is devoted to the construction of optimizing insertions in complicated conditions: it is required to reduce the fragment of precedence conditions and to transform the corresponding cost functions; in the last case, it is important to preserve the dependence on tasks list. Both above-mentioned moments are taken into account under the procedure construction having the sense of algorithm on functional level.

Keywords: route, trace, precedence conditions.

UDC: 519.6

MSC: 28A33

Received: 15.11.2014

DOI: 10.20537/vm140410



© Steklov Math. Inst. of RAS, 2025