Reconstruction of a consistent schedule in connection with change of the volume of a job
T. E. Safonova
Abstract:
Changes occurring in minimizing total penalty of consistent schedules due to the changes of the volume of a job are investigated. A reconstruction algorithm is developed, and an estimate of its complexity is obtained.