Publications in Math-Net.Ru
-
Schedules for performing tasks in interconnected sequential production systems
Probl. Upr., 2020, no. 5, 71–80
-
Two-stage planning tasks for the flow line
Probl. Upr., 2019, no. 6, 52–62
-
Building the assembly line timetables in small- and medium-scale production
Probl. Upr., 2019, no. 2, 54–59
-
Selection of an effective technological mode in the conditions of fuzzy-regression mathematical model
Probl. Upr., 2017, no. 5, 70–76
-
Mathematical models and algorithms for acceptable and optimal cargo delivery routes constructing
Probl. Upr., 2016, no. 5, 57–70
-
The set of Pareto efficiency criteria presented stochastic and fuzzy data
Artificial Intelligence and Decision Making, 2014, no. 2, 89–101
-
The construction schedule for the performance of tasks of parallel systems of machines and production lines
Probl. Upr., 2013, no. 6, 62–70
-
Properties of admissible and optimum sequences of performance of works on a single machine
Probl. Upr., 2012, no. 5, 54–61
-
Mathematical models and algorithms for operational control of mail and cargo traffic in postal network
Probl. Upr., 2011, no. 5, 32–39
-
Solution of the generalized Johnson problem with constraints on the schedule and time of the machine. Part 2. Approximate methods of solution
Probl. Upr., 2010, no. 4, 12–19
-
Solution of the generalized johnson problem with constraints on the schedule and time of the machine. Part 1. Exact solution methods
Probl. Upr., 2010, no. 3, 17–25
-
Mathematical models and algorithms for solution of one class of applied nonlinear boolean programming problems
Avtomat. i Telemekh., 1981, no. 8, 179–184
-
Certain properties of scheduling theory problems
Avtomat. i Telemekh., 1978, no. 1, 123–132
-
A generalized travelling salesman problem and its applications
Avtomat. i Telemekh., 1976, no. 10, 120–132
-
Optimal planning of level of initial reserves and funds for material resources
Avtomat. i Telemekh., 1975, no. 9, 99–107